Parkview Property Services, LLC (License No. PARKVPS829NP), a Washington limited liability company (“Parkview”) and the individual or corporate entity (“Owner”) (singularly, a “Party”; collectively, the “Parties”) authorizing, accepting and agreeing to (i) the associated Parkview estimate (the “Estimate”) and (ii) these terms and conditions (“Terms and Conditions”) associated with that Estimate published on jobber.com for the property located at the Service Address (“Agreement”), agree to the following, effective upon the date of acceptance of the aforementioned Estimate (the “Effective Date”).
Background
This Agreement concerns accessibility-related renovations, additions, and/or other improvements to the real property located at the Service Address identified in the Estimate (the “Project”).
Recitals
WHEREAS Owner desires to make certain improvements to the Project, and Parkview desires to assist the Owner in constructing those improvements.
WHEREAS Owner desires to hire Parkview to construct and manage the Project in accordance with the Terms and Conditions of this Agreement.
WHEREAS, Parkview has the experience, knowledge, and skills to provide the services necessary for managing and constructing the Project and is willing to provide its services to the Owner in accordance with the Terms and Conditions of this Agreement.
NOW THEREFORE, subject to the Terms and Conditions as set forth below, and in consideration of the mutual promises exchanged by the Parties in this Agreement, the Parties agree as follows:
Definitions
“Allowance” shall mean an amount established in the Estimate, if applicable, for inclusion in the Agreement Amount to cover the cost of prescribed items not specified in detail, with provision that variations between such amount and the finally determined costs of the prescribed items will be reflected in Change Orders appropriately adjusting the Agreement Amount.
“Change Order” shall mean a written order issued after execution of this Agreement authorizing a change or adjustment in the Agreement Amount or time for completion, which may add to, subtract from, or vary the Scope of Work Parkview agreed to perform under this Agreement. Changes in the Scope of Work that may require a Change Order include, but are not limited to (i) hidden conditions such as boulders or debris beneath the surface of the soil, (ii) hidden conditions within existing structures such as hazardous material, decay, and abandoned electrical, plumbing, and mechanical work or hidden layers of plaster or drywall, (iii) requests by the Owner for additional items of work or for deletion of items, and (iv) additional requirements by permitting authorities or project design professionals beyond those shown in any Project drawings or specifications. Owner is encouraged to set aside contingency funds to cover the costs of Change Orders, which are a normal part of any construction project.
“Commencement Date” shall mean the agreed upon date when Parkview will start construction at the Project.
“Agreement Amount” shall mean the total cost identified in the Estimate, not including Change Orders.
“Day” shall mean the number of Days, as counted on a calendar, excluding the date of service, delivery, receipt, or acceptance.
“Estimate” shall mean a Parkview proposal for materials and services at the Service Address, which describes the Scope of Work Parkview is willing to execute for the Agreement Amount and in accordance with these Terms and Conditions.
“Existing Work” shall mean the existing portions of the Project, including but not limited to drywall, plaster, plumbing, electrical, tile, and/or other finishes that will remain and are not identified in the Scope of Work described in the Estimate.
“Substantial Completion” shall mean the state of completion reached when an improvement upon real property may be used or occupied for its intended use, though punch list items may still remain.
“Work Area” shall mean the area of the Project necessary for Parkview to perform the Scope of Work.
Project Scope and Payment Terms
Project Description. Parkview agrees to perform the scope of work attached to the Estimate, or if no scope of work is attached, the scope of work identified in the Estimate (“Scope of Work”).
Duration of Offer. The Estimate and the Terms and Conditions of this Agreement associated with the Estimate shall be held open by Parkview for acceptance by Owner for a period of ninety (90) Days from the date identified on the Estimate.
Payment and Deposit. Payment of the full amount identified in the Estimate is due and payable upon completion of the Scope of Work and presentation of a Parkview invoice. Parkview may require a deposit prior to starting the Scope of Work identified in the associated Estimate, and in such a case, the balance (Total Agreement Amount identified in the Estimate minus deposit amount) is due upon completion of the Scope of Work.
Payment Due Date, Penalties. After Owner receives a Parkview invoice, any balance unpaid after thirty (30) Days from the date of invoice is subject to a re-billing fee of $25.00 per month and a 1% per month late fee. Parkview will not hold funds (i.e., postdated check, holding credit cards without debiting them, etc.). Parkview accepts credit cards and checks, except as stated herein. In the event of any default in payment, Owner agrees to pay all costs of settlement and collection, incurred or expended, including but not limited to interest fees, costs of suit or arbitration, and reasonable attorneys’ fees. If Owner payment by check is returned to us unpaid, Owner agrees it shall be replaced with a money order within five (5) Days for the same amount, plus a $50 fee. If payment is not received by Parkview within five (5) Days of the returned check, collection efforts will begin immediately. Parkview’s delay in meeting Owner deadlines shall not delay payment under this paragraph or permit a reduction in the Agreement Amount.
Market Volatility. If the price of materials increases or if there are supply chain issues affecting the cost of materials in an amount equal to or greater than ten (10) percent from the costs originally quoted in the Estimate to the date supplies are actually purchased, Owner shall reimburse Parkview for the difference in material costs. Quotes will be provided, upon request, that show cost changes from the Estimate to current costs affected by market volatility or supply change impacts.
Owner’s Obligations
Authority. Owner warrants it is the owner of the Project and possesses the right to modify the Project in accordance with the Scope of Work.
Permits. Owner shall, at Parkview’s request, obtain all permits or other necessary government approvals for construction of the Project and shall pay all associated costs of such permits or approvals separate from this Contract, unless expressly agreed otherwise by Contractor.
Location of Property Line. Owners shall, if requested by Parkview, identify the location of all property lines, easements, or other setbacks that may impact the Scope of Work. Owner shall be responsible for the accuracy of property lines, easement, or other setbacks it identifies. Owner shall ensure Parkview has the necessary legal access to the Project and bear all costs associated with such access. Owner agrees Parkview may rely upon any such information provided by Owner.
Allowances. An Allowance may be allocated for certain materials identified by Owner. Such materials shall be selected by Owner and purchased by Parkview subject to the Terms and Conditions of this Agreement.
Maintenance of Access for Contractor and Subcontractors. Owner agrees to (i) maintain access to the Project property, structure, and parking for Parkview and all Parkview’s subcontractors; (ii) keep Project entryways to the property free and unobstructed; and (iii) provide Parkview access to the Project during the hours of 7:00 am until 5:00 pm.
Protection of Personal Property. Owner shall remove all personal property from the Work Area.
Owner’s Safety Obligations. Owner shall keep children and pets away from the Work Area and agrees to contact Parkview and/or Parkview’s site supervisor for permission before accessing the Work Area.
Substitution. Owner-initiated substitutions and/or changes will be subject to a Change Order, as appropriate.
Insurance. Owner shall secure and maintain Builder’s Risk insurance for the Project to its full insurable value (replacement cost) including the peril of theft, materials delivered to the Project (irrespective of whether those materials are incorporated into or adjacent to the Project), miscellaneous materials, tools, and supplies incidental to the Scope of Work, and any temporary structures. If construction is to be performed on an existing residential structure, the Owner may retain an all-risk policy, provided that Owner verifies that the all-risk policy insures such work. Owner’s policy limits may need to be increased in consideration of the value of the existing structure and improvements to be added. Parkview shall be named as an additional insured on the insurance obtained by Owner pursuant to this Paragraph 9. Owner waives its right of subrogation against Parkview for any losses covered by the required insurance policies.
Cancellation Fees and Charges. Upon the Effective Date of this Agreement, Parkview will begin to procure equipment and supplies, plan, mobilize labor, and secure time on its schedule for the Project, which may include turning away other work. Owner agrees it shall fully-reimburse Parkview for all costs Parkview incurs up to and through the date of cancellation plus twenty percent (20%).
Testing and Removal of Hazardous or Toxic Materials. Owner shall be responsible for the discovery and removal of hazardous and/or toxic materials, unless otherwise agreed in writing. Parkview shall retain the right to test for hazardous and/or toxic materials prior to the Commencement Date and throughout construction of the Project. If such materials are discovered, Parkview may coordinate the proper removal and disposal of these materials and any additional resulting costs incurred, not already accounted for in the Estimate, will be documented in a Change Order.
Work Not in Accordance with This Agreement. Owner shall give Parkview written notice and reasonable time to repair portions of the Project alleged not to be in conformance with this Agreement. Owner may accept work not in accordance with this Agreement or the Scope of Work.
Matching Existing Finishes or Samples. Owner acknowledges, understands, and agrees that perfectly matching new materials to existing materials is unrealistic. Parkview will endeavor to “match” new material to existing materials in accordance with industry standards.
Termination of Contract by Owner. Upon written notice, Owner may terminate the Project for Parkview’s material breach of this Agreement. In the event of such termination, Owner shall pay Parkview for all work completed up to and through the date of date Parkview actually receives such notice within three (3) business Days.
End-of-Project Punch List. Owner shall, within five (5) Days of the date of Substantial Completion, prepare a single list of work required to complete the Scope of Work and any other obligation contained in this Agreement. Owner’s failure to prepare a punchlist shall be deemed an acceptance of Parkview’s work.
Parkview’s Obligations
Construction, Generally. Parkview’s work shall be completed in a safe, workmanlike manner, and in compliance with the permitted drawings. All products and materials installed by Parkview will be new and of good quality, unless such materials or products were provided by the Owner or workers other than Parkview hired by Owner. Unless otherwise noted in the Scope of Work, Parkview shall perform all work during the hours of 7:00 am until 5:00 pm, or as allowed by any authority having jurisdiction.
Validity of Quotations. Unless otherwise stated quotes, estimates, and/or pricing during construction of the Project are valid for thirty (30) Days.
Safety. Parkview will perform all work in a safe manner, maintain a safe workspace, and provide proper safety attire and tools.
Insurance. At all times during the course of construction of the Project, Parkview shall procure, purchase, and maintain Commercial General Liability (“CGL”) insurance in such amounts as required by Washington State’s Department of Labor & Industries.
Cleanup. Parkview shall be responsible for removal of all waste and construction materials from the site in a workmanlike manner and consistent with industry standards within twenty-four (24) hours following Substantial Completion of the Project. On a daily basis during construction, Parkview shall broom clean the Work Area and dispose of all construction waste and excess material.
Selection of Subcontractors and Suppliers. Parkview reserves all rights in the selection of its subcontractors and suppliers.
Timely Performance. Parkview shall diligently work toward Substantial Completion of the Scope of Work. Parkview shall communicate any delays directly to the Owner.
Transfer of Material Ownership. Parkview will maintain ownership of all materials used during the Project until Final Payment has been credited to Parkview’s account. In the event of termination, Parkview shall maintain ownership of such materials until it is paid any and all outstanding amounts owing.
Delays. Parkview shall not be responsible for delays, which include but are not limited to the following:
The failure of the Owner to make payments when due or to make timely decisions.
Difficulty obtaining required building permits or other government approvals necessary for the project.
Acts of God, including earthquakes, floods, storms, pandemics, government order, and delays arising from such events.
Social or political events, including religious and other holidays, strikes, riots or other civil commotion, and acts of war or terrorism.
Inability on Parkview’s part, for reasons not reasonably foreseen, to obtain material through the usual channels and suppliers.
Failures in performance by subcontractors that Parkview could not have reasonably foreseen.
Loss of key employees or subcontractors due to injury or other reason Parkview could not have reasonably foreseen.
Difficulty due to economic or other conditions in hiring replacements for lost personnel adequately skilled to perform to Parkview’s standards.
Changes in work arising for any reason, including hidden conditions, loss of access to the property, changes to the Scope of Work, or other requests by the Owner.
Interruption or delay by any federal agency, authority having jurisdiction, tribe, nation, or any third-party for any reason whatsoever.
Effect of Delay. If the Scope of Work is interrupted, increase, delayed, and/or otherwise changed by any federal agency, authority having jurisdiction, tribe, nation, or any other third-party, for any reason whatsoever or if Parkview is unable to reasonably perform its duties once on site due to circumstances beyond its control, including but not limited to the delay events identified in Section F, Paragraph 9, such delays shall be subject to a Change Order, as may be appropriate.
Stopping of Work. Parkview reserves its right to stop work if (i) the Owner breaches this Agreement by failing to pay Parkview in accordance with the Terms and Conditions of this Agreement, (ii) failing to make timely decisions that affect the Project timeline or costs, or (iii) for any other material breach by Owner.
Liens. Parkview reserves it statutory right to and may record a lien against the Owner’s property if payment in full is not received. Other Project participants may also have lien rights. See Attachment B. Notwithstanding the Dispute Resolution terms provided below, Parkview may commence a lawsuit as necessary to preserve lien rights and stay that lawsuit pending Arbitration. BY ACCEPTING THE ESTIMATE, WHICH INCORPORATES THESE TERMS AND CONDITIONS, OWNER EXPRESSLY ACKNOWLEDGES RECEIPT OF PARKVIEW’S REQUIRED DISCLOSURE STATEMENT UNDER RCW 18.27.114 (ATTACHMENT B) AND, SINCE OWNER WILL HAVE ACCEPTED THESE TERMS AND CONDITIONS DIGITALLY, AGREES SUCH ACCEPTANCE IS EQUIVALENT TO OWNER’S ACTUAL SIGNATURE ACKNOWLEDGING RECEIPT OF THE REQUIRED DISCLOSURE.
Existing Work. Parkview shall not be responsible for damage to, failure of, or defects in Existing Work or the work performed by Owner or Owner’s contractors. Parkview shall use its best efforts to mitigate damage to Existing Work.
Termination. Parkview may terminate this Agreement for cause if the Owner materially breaches these Terms and Conditions. Prior to terminating this Agreement for cause under this Paragraph 14, Contractor shall first provide Owner seven (7) Days written notice of the alleged breach. If Owner fails to cure the breach within seven (7) Days of receipt of such notice or fails to commence and diligently continue with cure efforts, if the breach cannot reasonably be cured within seven (7) Days, the Contractor may terminate the Contract.
Warranty. Parkview warrants (“Parkview’s Warranty”) that its work shall be in accordance with this Agreement, performed in a workmanlike manner, within industry standards, in compliance with relevant codes, constructed in substantial compliance with manufacturers’ specifications, and free from material structural defects. Parkview shall return and repair any Work not in accordance with this Agreement for a period of one (1) year from the date of Substantial Completion (the “Warranty Period”). OWNER’S EXCLUSIVE REMEDY IS REPAIR OF DEFECTIVE WORK OR REPLACEMENT OF A DEFECTIVE PRODUCT BY PARKVIEW, PROVIDED OWNER NOTIFIES PARKVIEW IN WRITING WITHIN THE WARRANTY PERIOD AND GIVES ACCESS TO THE SITE AND A REASONABLE LENGTH OF TIME TO CORRECT ANY DEFICIENCIES.
No Other Warranty. PARKVIEW’S WARRANTY IS THE SOLE WARRANTY PROVIDED TO OWNER. PARKVIEW’S WARRANTY IS GIVEN IN LIEU OF ANY OTHER EXPRESS OR IMPLIED WARRANTY OTHERWISE PROVIDED UNDER THE LAWS OF THE STATE OF WASHINGTON. Parkview’s employees, salespersons, subcontractors, vendors, or other agents are not authorized to make any warranty or representation other than as set forth in this Agreement nor can such persons or entities extend or in any way alter Parkview’s Warranty. OWNER’S DIGITAL ACCEPTANCE OF THE ESTIMATE AND THESE TERMS AND CONDITIONS ARE ITS AGREEMENT OWNER HAS SOUGHT LEGAL ADVICE ON THIS MATTER OR HAD THE OPPORTUNITY TO SEEK COUNSEL FOR INTERPRETATION OF THIS CLAUSE AND KNOWINGLY AND VOLUNTARILY ACCEPTS PARKVIEW’S WARRANTY AND ITS LIMITATION PERIOD.
Notice of Claim. FOR RESIDENTIAL PROJECTS, WASHINGTON LAW, CHAPTER 64.50 RCW, CONTAINS IMPORTANT REQUIREMENTS THAT CERTAIN CLAIMANTS MUST FOLLOW BEFORE CLAIMANT MAY FILE A LAWSUIT FOR DEFECTIVE CONSTRUCTION AGAINST CONTRACTOR. FORTY-FIVE (45) DAYS BEFORE CLAIMANT FILES A LAWSUIT, CLAIMANT MUST DELIVER TO CONTRACTOR A WRITTEN NOTICE OF ANY CONSTRUCTION CONDITIONS CLAIMANT ALLEGES ARE DEFECTIVE AND PROVIDE CONTRACTOR THE OPPORTUNITY TO MAKE AN OFFER TO REPAIR OR PAY FOR THE DEFECTS. CLAIMANT IS NOT OBLIGATED TO ACCEPT ANY OFFER MADE BY CONTRACTOR. THERE ARE STRICT DEADLINES AND PROCEDURES UNDER STATE LAW, AND FAILURE TO FOLLOW THEM MAY AFFECT CLAIMANT’S ABILITY TO FILE A LAWSUIT.
Shared Obligations
Assignment of Contract to Other Parties. Neither Party shall assign or transfer this Agreement or any rights hereunder without the prior written consent of the other, which consent shall not be unreasonably withheld.
Changes in the work. All changes in the work shall be documented with a written Change Order.
Dispute Resolution.
Mediation. If a dispute arises under this Agreement, the Parties agree to first resolve the dispute with a mediator selected by Parkview, in King County or the county of the Project at Parkview’s sole discretion, such as Washington Arbitration and Mediation Service or King County Dispute Resolution Center. The Parties will equally split the mediator’s fee and any other costs. Each Party shall bear its own attorneys’ fees and costs (if any). Mediation shall be a pre-condition to Arbitration under this Section.
Arbitration. If the Parties cannot resolve the dispute through mediation, they shall submit their dispute to an arbitrator selected by Parkview, in King County or the county of the Project at Parkview’s sole discretion, through the commercial arbitration rules of American Arbitration Association (AAA.org), in which a single arbitrator will decide the matter and approved procedures. Judgment upon the award rendered by the arbitrator may be entered in any court having jurisdiction.
Preservation of Lien Rights. Notwithstanding the foregoing, Parkview may commence a lawsuit as necessary to preserve lien rights and stay that lawsuit pending arbitration. Owner and Parkview agree that arbitrator shall have jurisdiction to determine the validity and amount of any lien.
Survival. In the event any clause or provision of this Agreement shall be held to be invalid, then the remaining clauses and provisions shall nevertheless be and remain in full force and effect.
Integrated Agreement. This Agreement contains the entire agreement between the Parties with respect to construction of the Project. All other agreements, oral or written, are hereby superseded by this Agreement. There are no other agreements that modify or affect these Terms and Conditions. No modification of this Agreement shall be binding unless the terms are in writing and signed by both Parties.
Binding Effect. This Agreement shall be binding upon the Parties, and their heirs, successors, executors, administrators, and assigns.
Notice. All notices that may be required under this Agreement are to be in writing and delivered (i) to the attention of the party at the Owner Address identified in the Estimate; or (ii) by email to an email address provided to Parkview by Owner; or (iii) mailed by certified mail, postage prepaid, to the Owner Address identified in the Estimate. All notices shall be deemed served upon actual delivery, successful transmission, or two (2) Days following deposit of the notice in the U.S. mail, whichever is earlier, as required herein.
Changes. Changes to this Agreement or the Scope of Work must be in writing.
Headings. Headings of the paragraphs in this Agreement are intended solely for convenience of reference and are not intended nor shall they be used to construe, explain, modify, or place any meaning upon any provisions therein.
Severability. In the event any provision of this Agreement is deemed to be unenforceable, the remaining provisions shall remain in full force and effect.
Governing Law, Venue. The performance and interpretation of this Agreement shall be governed in accordance with the laws of the State of Washington. Any litigation arising out of or in connection with this Agreement shall be conducted in the County where the Project is located.
Limitation on Damages. Contractor and Owner waive claims against each other for consequential damages. This mutual waiver includes, but is not limited to damages (i) incurred by Owner for loss of income, loss of use, rental expenses, profit, financing, business, and reputation; and (ii) incurred by Contractor for losses of financing, business and reputation, and for loss of profits, except Contractor’s anticipated profit arising directly from the work contemplated by this Agreement, which the Parties agree is not to be consequential damage. This mutual waiver is applicable, without limitation, to all consequential damages due to either party’s termination in accordance with Section E, Paragraph 14 and Section F, Paragraph 14.
Attorneys’ Fees. The prevailing Party to any Superior Court lawsuit or binding arbitration shall be entitled to recover its reasonable pre-judgment and post-judgment costs and expenses, attorneys’ fees, as well as expert fees.
By digitally accepting the Estimate, Owner acknowledges it has read the Terms and Conditions of this Agreement (INCLUDING TERMS AND CONDITIONS IN BOLD AND/OR UNDERLINED CAPITALS), its Attachments, and sought legal counsel, as necessary, and by such acceptance Owner agrees to be bound to all such Terms and Conditions, even to the extent such agreement waives any rights, statutory or otherwise.
ATTACHMENT B
NOTICE TO CUSTOMER
This contractor is registered with the state of Washington, registration no. PARKVPS829NB, and has posted with the state a bond or deposit of $12,000 for the purpose of satisfying claims against the contractor for breach of contract including negligent or improper work in the conduct of the contractor’s business. The expiration date of this contractor’s registration is October 14, 2026.
THIS BOND OR DEPOSIT MIGHT NOT BE SUFFICIENT TO COVER A CLAIM THAT MIGHT ARISE FROM THE WORK DONE UNDER YOUR CONTRACT.
This bond or deposit is not for your exclusive use because it covers all work performed by this contractor. The bond or deposit is intended to pay valid claims up to $12,000 that you and other customers, suppliers, subcontractors, or taxing authorities may have.
FOR GREATER PROTECTION YOU MAY WITHHOLD A PERCENTAGE OF YOUR CONTRACT.
You may withhold a contractually defined percentage of your construction contract as retainage for a stated period of time to provide protection to you and help insure that your project will be completed as required by your contract.
YOUR PROPERTY MAY BE LIENED.
If a supplier of materials used in your construction project or an employee or subcontractor of your contractor or subcontractors is not paid, your property may be liened to force payment and you could pay twice for the same work.
FOR ADDITIONAL PROTECTION, YOU MAY REQUEST THE CONTRACTOR TO PROVIDE YOU WITH ORIGINAL “LIEN RELEASE” DOCUMENTS FROM EACH SUPPLIER OR SUBCONTRACTOR ON YOUR PROJECT.
The contractor is required to provide you with further information about lien release documents if you request it. General information is also available from the state Department of Labor and Industries.